when replacing a 3gb SBB module on an Enclosure, replacing it with a 6Gb SBB moule is supported --False when replacing a power cooling module, what is the maximum amount of time allowed between removing the old PCM and installing the new PCM? -- 10 minutes An outage is required when replacing an IO card in a Single Controller system --True Once the flash drive has been replaced and the IO and power cables are connected, what is the next action that needs to be taken --Connect a Null Modem Cable and open a terminal emulation program When a drive is beaconed on an enclosure, what is the physical indicator to look for? --Amber flashing LED Wehn replacing a drive on an enclosure, why is it necessary to leave the drive pulled out 1 inch for 30 seconds? --Allow the drive time to spin down What tool is required to unlock a drive on an enclosure? --Torx T-10 driver Where in the Storage Center GUI can you find the status of the Controller FC IO cards? -- Controllers > ControllerName > IO Cards > FC Which of the following are valid "Front End" connectivity types? -- iSCSI -- Fibre Channel To replace a mid-plane fan what action must be performed? -- Removfe the top cover